Snagging New Build Property in Dubai | Tips Before Handover

Introduction: Don’t Accept Your New Home Without These Snagging Tips

Just got notified that your new property is ready for handover? Whether you’ve bought an off-plan apartment in Dubai Marina or a newly built villa in Arabian Ranches, snagging your home is a non-negotiable step before you move in or make the final payment.

But snagging isn’t just a checklist — it’s a strategy. These must-know snagging tips will help you avoid developer excuses, missed defects, and expensive post-handover surprises.


What Is Snagging?

Snagging is the process of inspecting a newly constructed or renovated property to identify all visible and hidden defects. A professional snagger creates a snag list — a detailed report developers are required to address, especially within the Defects Liability Period (DLP).


Why Snagging New Builds in Dubai Is Essential

  • 🧱 Fast construction = hidden flaws
  • 💸 Developers may cut corners near completion
  • 📋 You lose leverage after final payment
  • 🧰 Snags caught early = free repairs during DLP
  • 🛡 It’s your legal proof if things go wrong

✅ Must-Know Tips for Snagging Your New Build Property

Here are practical, field-tested tips that every Dubai property buyer should follow before handover:


🔍 1. Book a Certified Snagging Expert — Not a DIY Walkthrough

Even if you’re experienced in construction or interiors, you won’t have the tools or time to catch everything. Certified snaggers:

  • Use tools like moisture meters, thermal scanners, socket testers
  • Understand Dubai Municipality and RERA compliance
  • Know where developers often hide shortcuts
  • Provide professional snag reports accepted by developers

🗓 2. Time It Right — Inspect Before Final Payment

Book your inspection:

  • After handover notice is received
  • Before making final payment or escrow release
  • Before moving in any furniture
  • Within the first 12 months (DLP window)

Developers are more responsive before you pay.


🏠 3. Check Every Room, Every Corner

Don’t assume everything works. Professional snaggers inspect:

  • Cracks in ceiling/walls
  • Skirting alignment
  • Paint quality
  • Floor tiling levels
  • Cabinet doors and soft-close hinges
  • Window seals and door locks
  • AC airflow in each room
  • Balcony railings and drainage
  • DB panel and electrical safety
  • Bathroom leaks and waterproofing
  • Kitchen counter seals and appliance fitting

Miss one item — and you might pay for it later.


💼 4. Request a Snag Report With Photos & Severity Levels

The best snagging companies provide:

  • 500+ inspection points
  • High-resolution photos with notes
  • Defect severity classification (major/minor/cosmetic)
  • Clear repair recommendations
  • A full PDF report in 24–48 hours

This makes it easy to submit to developers and demand timely rectification.


📢 5. Use the Report to Enforce Repairs — Then Re-Inspect

Once your snag list is submitted:

  • ✅ Follow up with the developer
  • ✅ Give them time to fix (usually 7–14 days)
  • ✅ Request a re-inspection if needed
  • ✅ Keep a record of communication
  • ✅ Document “before and after” for warranty protection

Real Case: Tips That Saved AED 34,000 in Future Fixes

A first-time buyer in Jumeirah Village Circle followed our must-know tips:

  • Booked the inspection 3 days after handover notice
  • Delayed final payment until snag fixes were confirmed
  • Used the report to push the developer to fix 66 issues — including major AC insulation failures, poorly grouted bathrooms, and unsafe electrical wiring

Result: Full rectification within 10 days, no post-move-in expenses, and AED 34,000 saved.


Bonus Tip: Snagging Isn’t Just for Homes

Snagging also applies to:

  • 🏢 Offices
  • 🏨 Short-term rental units
  • 🛠️ Renovated properties
  • 🏗️ Fit-outs and extensions

If work has been done — it should be inspected.


Conclusion: Smart Buyers Snag Early

Snagging isn’t about being picky. It’s about ensuring your home is safe, complete, and worth what you paid. These must-know tips for snagging new build properties in Dubai will help you avoid regret — and move in with peace of mind.


✅ Ready to Snag Your New Build Property?

📱 WhatsApp: +971 56 378 7002
🌐 Visit: dubaipropertysnagging.ae
📝 Get your certified snagging report in 12 hours | Starting AED 499 | Dubai-wide service | Pay with Tabby


We are certified by DED, approved by RERA, and proudly InterNACHI-accredited — delivering trusted, precise, and professional snagging inspections across Dubai.

Share Article

Whether you’re unsure about snagging inspections or need advice on your property, we’re here to assist you.

Call Now
Need Service?