A pre-handover villa snagging inspection in Mudon Al Ranim, Dubai covering tiles, paint, joinery, bathrooms, electrical, AC, thermal imaging and moisture checks, delivered as a documented snagging report before handover.
An independent quality-control stage between contractor completion and owner acceptance — finishes, joinery, MEP, wet areas and external works across ten trades.
An independent technical assessment of a secondary-market waterfront villa before the buyer completed the transaction — finishes, MEP, moisture, pool and external areas.
A six-bedroom waterfront villa inspected room by room and system by system — architectural finishes, MEP, wet areas, glazing, external spaces and pool.