New Build House Snagging | 10 Steps for a Handover in Dubai

Introduction: Make Your New House Perfect from Day One

Buying a new house in Dubai? Congratulations — but before you move in or release the final payment, there’s one step that guarantees your peace of mind: snagging.

Snagging a newly built house doesn’t have to be complicated. With the right approach, you can catch every defect, hold the developer accountable, and avoid costly post-handover repairs.

In this guide, we walk you through 10 easy steps for new build house snagging in Dubai — used by professionals and smart buyers alike.


✅ Step 1: Understand What Snagging Is

Snagging is the process of inspecting your newly built house for defects, unfinished work, or poor craftsmanship before handover.

A professional snag report ensures your property is:

  • Structurally sound
  • MEP systems are working (Mechanical, Electrical, Plumbing)
  • Finished according to promised quality
  • Free from safety or usability issues

🗓 Step 2: Time It Right

Schedule your inspection:

  • After receiving the handover notice
  • Before releasing your final payment or escrow
  • Before moving any furniture
  • Ideally within the DLP (Defects Liability Period)

Timing is critical — developers are far more responsive before full settlement.


🧑‍🔧 Step 3: Hire a Certified Snagging Company

Don’t attempt to inspect the house yourself. Instead, hire a RERA-approved, InterNACHI-certified snagger with experience in villas or new builds.

They’ll bring tools like:

  • Moisture meters
  • Socket testers
  • Thermal cameras
  • AC airflow testers
  • Megger and voltage analyzers

This ensures even hidden or technical defects are uncovered.


📋 Step 4: Get a Full Property Inspection

Your inspector should check over 500+ items including:

  • Cracks in paint or plaster
  • Faulty electrical switches or exposed wiring
  • Water pressure, leaks, and drain slopes
  • AC drainage and thermostat calibration
  • Window seals and door alignment
  • Flooring, tiling, skirting, and grouting
  • Cabinet installation and soft-close function
  • Roof and balcony waterproofing (for villas)

📷 Step 5: Review the Snag Report

Expect a 24–48 hour turnaround on your snagging report, which should include:

  • Itemized defect list
  • High-resolution photos
  • Severity ratings (Cosmetic / Minor / Major)
  • Clear, actionable repair recommendations
  • PDF format sharable with your developer

📣 Step 6: Share the Report with the Developer

Submit the snag list via email or developer portal, and:

  • Highlight urgent or safety issues
  • Request estimated timelines for each fix
  • Set follow-up dates
  • Save all communication for record

🔁 Step 7: Allow Time for Repairs

Most developers in Dubai respond within 5–15 business days. Be patient, but proactive.

Track completed vs pending items and keep your snagger updated for re-inspection if needed.


🧾 Step 8: Request Re-Inspection (Optional but Recommended)

After repairs are completed, book a follow-up snagging visit to confirm everything has been addressed correctly — especially hidden defects like:

  • AC condensation or low airflow
  • Minor leaks that take time to surface
  • Electrical grounding or socket overloads

🔐 Step 9: Only Then — Finalize Handover or Payment

Once everything is resolved, you can safely:

  • Accept the handover
  • Release the final payment
  • Begin your move-in with full confidence

Without this step, you take responsibility for all remaining defects — even if they were builder-caused.


🧰 Step 10: Keep Your Report for Future Claims

Your snag report can be used for:

  • DLP warranty claims (within 12 months)
  • Tenant handovers (if you rent the home)
  • Legal proof if repairs are delayed
  • Resale disclosure documents

Your snag report is as important as your title deed. Don’t discard it.


Real Case: A 10-Step Snagging Saved a Buyer AED 38,000

A client in Dubai Hills Estate followed all 10 steps. Their report revealed:

  • 71 issues including misaligned AC ducting, poor bathroom waterproofing, and incorrect DB labels
  • The developer fixed everything before key handover
  • The client saved over AED 38,000 in post-handover repair costs and moved in with zero hassle

Conclusion: Snag Smart. Move in Stress-Free.

Snagging isn’t just a technical process — it’s a protection plan for your future. With these 10 steps, you’ll ensure your new house in Dubai is everything you paid for — no defects, no surprises, just perfection.


✅ Ready to Snag Your New Build House?

📱 WhatsApp: +971 56 378 7002
🌐 Visit: dubaipropertysnagging.ae
📝 Get a certified snagging report in 12 hours | Starting from AED 499 | Dubai-wide service


We are certified by DED, approved by RERA, and proudly InterNACHI-accredited — delivering trusted, precise, and professional snagging inspections across Dubai.

Share Article

Whether you’re unsure about snagging inspections or need advice on your property, we’re here to assist you.

Call Now
Need Service?